CUSTOMER STORY · PRECISION PLASTICS

Catching machine drift before it costs a $20K batch

Plastic parts for aerospace, nuclear and medical, at $5K–20K per batch. Every cycle is checked against each machine’s own healthy baseline.

ANOMALYPRESSURECYCLE TIME

How it works

1

Step 1 · LEARN “HEALTHY”

Every cycle mapped: temperature, pressure, timing. Each machine’s normal, defined.

HEALTHY RANGE

One baseline per machine

2

Step 2 · PREDICT

Machines drifting toward failure get flagged. Maintenance is planned, not rushed.

FAILURE THRESHOLDFLAGGED HERE

Predictive Maintenance Agent · drift detection · full traceability

IN 6 MONTHS

$200K

saved in downtime, machine costs and plastics

Seconds

not weeks, to spot an anomaly in a cycle

$20K

at stake in every batch protected